| ===== Mission ===== | ===== Mission ===== | ||
| - | | {{ : | + | | {{ : |
| | Max Gunther Doering | | Max Gunther Doering | ||
| + | ===== The MGC building in 2008 (approx.) ===== | ||
| + | {{: | ||
| + | //Fig.: The MGC building with porch in approx. 2008.// | ||
| - | ===== Today (2019) ====== | ||
| - | {{ : | + | ===== Current state of the building (May 2019) ====== |
| + | |||
| + | {{: | ||
| + | //Fig.: The abandoned MGC building in May 2019.// | ||
| + | |||
| + | Today the center is close to deterioration. It is high time to save the building! It is still feasible to refurbish it. | ||
| + | |||
| + | The roof is still intact, as well as the wooden pillars suporting it. | ||
| + | |||
| + | Some of the wooden pillars supporting the floor are rotten and have to be replaced as well as some elements of the floor joist. | ||
| + | |||
| + | The front wall is missing. | ||
| + | |||
| + | ===== Measures to be taken ===== | ||
| + | |||
| + | - Replace the wooden pillars supporting the platform with concrete piles | ||
| + | - Replace the rotten floor joists | ||
| + | - Waste disposal | ||
| + | - Construct a new front wall | ||
| ===== History ===== | ===== History ===== | ||